
Description
Destiny Homes presents their Parker floor plan in Urbandale's Waterford Ridge development. This ranch plan features 4 bedrooms, 3 baths, and over 2000 square feet of finished space including the lower level. Great split bedroom plan on the main with a guest room/office in the front of the home and open concept layout in the back of the home with access to the master off the living area. Open concept kitchen/dining/living area that features a large island, corner pantry, electric fireplace, large picture window and a slider off the back of the home. The finished lower level has a large family room, full bath and 2 bedrooms with plenty of storage.There is a long list of standard features including electric fireplace, smart home automation, quartz counter tops, passive radon system and 2x6 construction. Plus ALL appliances are included! Ask about $2,000 in closing costs provided by preferred lender. As of 07/06/2022 the house is in foundation stage - approximately 90 days until completion.
-
4BEDS
-
0.19ACRES
-
3BATHS
-
01/2 BATHS
-
1,258SQFT
-
$309$/SQFT
Description
Destiny Homes presents their Parker floor plan in Urbandale's Waterford Ridge development. This ranch plan features 4 bedrooms, 3 baths, and over 2000 square feet of finished space including the lower level. Great split bedroom plan on the main with a guest room/office in the front of the home and open concept layout in the back of the home with access to the master off the living area. Open concept kitchen/dining/living area that features a large island, corner pantry, electric fireplace, large picture window and a slider off the back of the home. The finished lower level has a large family room, full bath and 2 bedrooms with plenty of storage.There is a long list of standard features including electric fireplace, smart home automation, quartz counter tops, passive radon system and 2x6 construction. Plus ALL appliances are included! Ask about $2,000 in closing costs provided by preferred lender. As of 07/06/2022 the house is in foundation stage - approximately 90 days until completion.